Mold Masters Sportsplex Twin Arena Addition

Posted Oct 10th, 2013 in Projects

Mold Masters Sportsplex Twin Arena Addition

Location: Georgetown, ON
Client: The Corporation of the Town of Halton Hills
Contact: Melloul-Blamey Construction (Construction Manager)
Phone: 519-886-8850
Fax: 519-886-8898

Engineer: Smith and Andersen Consulting Engineering
Contact: David Tarquini
Phone: 416-487-8151
Fax: 416-487-9104

Project Duration: September 2012 - September 2013

Project Description

This project is an expansion and addition of two NHL sizes ice rinks to the existing Mold Masters Sportsplex facility located in Georgetown, Ontario. Also included in this facility are six change rooms, referee rooms, multipurpose rooms and a lobby, taking this facility to 140,000 square feet. A new refrigeration plant was created to support the two new ice surfaces. Mechanical systems are energy efficient and feature air to air recovery for change rooms, desiccant dehumidification for the ice rinks and refrigeration plant waste heat reclaim for domestic hot water preheat. Rooftop unit heating coils and arena infloor radiant heat are also using heat reclaim for energy efficiency. L.J. Barton’s scope of work included heat pumps through the building, reverse osmosis system, plumbing for showers, washrooms, concession stands, water filtration system along with boilers for heating and domestic water. This is a LEED Silver Certified Building.

Mold Masters Sportsplex, Georgetown, OntarioMold Masters Sportsplex, Georgetown, Ontario